Safe. Reliable. Hassle-free.
AC Switchbox Installation: Professional installation of an AC switchbox with safe electrical wiring, proper load connection, and testing to ensure secure and reliable power supply to the AC unit.
Answer: It is used to safely control and supply power to the AC unit through a dedicated switch.
Answer: Yes, a nearby electrical point is required for installation.
Ceiling Fan Installation: Professional installation of a ceiling fan with proper mounting, electrical connection, alignment, and testing to ensure safe and smooth operation.
Answer: It includes mounting the fan, connecting it to existing wiring, assembling blades, and testing.
Answer: No, electrical repairs or rewiring are not included in this service.
Answer: A standard ceiling fan installation usually takes 20–40 minutes.
Ceiling Fan Uninstallation: Safe removal of a ceiling fan from the mounting point, including disconnection of electrical wiring and careful dismantling without damage.
Answer: Yes, the fan is carefully disconnected from existing wiring without damaging the setup.
Answer: It usually takes about 15–30 minutes per fan.
Switch Replacement: Professional replacement of an electrical switch with proper fitting, safe wiring connection, and testing to ensure smooth and reliable operation.
Answer: It includes removing the old switch, installing a new one, wiring connection, and testing.
Answer: No, electrical fault repair or rewiring is not included in this service.
MCB/Fuse Replacement: Safe replacement of a faulty MCB or fuse with proper electrical connection, tightening, and testing to ensure secure and stable power supply.
Answer: It includes removing the faulty MCB or fuse and installing a new one with proper connection and testing.
Answer: It typically takes 20–40 minutes, depending on the panel condition.
Answer: Yes, proper installation and testing are done to ensure safe and stable power supply.
Door Bell Installation: Professional installation of a doorbell with proper wiring or battery setup, secure mounting, and testing to ensure clear and reliable operation.
Answer: It usually takes about 20–40 minutes, depending on the type.
Answer: No, electrical fault repair or rewiring is not included in this service.
Bulb/Tube Light Holder Installation: Professional installation of a bulb or tube light holder with proper electrical connection, secure mounting, and testing for safe and reliable operation.
Answer: It includes installation of the bulb or tube light holder, wiring connection, and testing.
Answer: It usually takes about 15–30 minutes per unit.
Answer: Yes, as long as a proper electrical point is available.
Switchbox Installation: Professional installation of a switchbox with proper electrical wiring, secure mounting, and testing to ensure safe and reliable power distribution.
Answer: It includes mounting the switchbox, wiring connection, insulation, and testing of sockets and switches.
Answer: It usually takes about 30–60 minutes, depending on wiring conditions.
Exhaust Fan Installation: Professional installation of an exhaust fan with proper wall mounting, electrical connection, and testing to ensure effective ventilation and smooth operation.
Answer: It includes mounting the fan, connecting it to existing wiring, and testing for proper airflow.
Answer: Yes, a working electrical connection is required for installation.
Answer: It usually takes about 30–60 minutes, depending on the site.
Exhaust Fan Uninstallation: Safe removal of an exhaust fan from wall or window, including disconnection of wiring and careful dismantling without damage.
Answer: It includes safe removal of the fan, disconnection of wiring, and basic dismantling.
Answer: It usually takes about 15–30 minutes per fan.
Inverter Installation: Professional installation of a power inverter with proper wiring, battery connection, secure mounting, and testing to ensure safe and reliable backup power supply.
Answer: It includes mounting the inverter, connecting it to the battery and existing wiring, and testing backup power.
Answer: It usually takes about 45–90 minutes, depending on the setup.
Inverter Uninstallation: Safe removal of inverter system including disconnection from battery and electrical setup, careful dismantling, and handling without damage.
Answer: It includes safe disconnection of the inverter from battery and mains supply and removal of the unit.
Answer: It usually takes about 20–45 minutes, depending on the setup.
Quick consultation for electrical repairs and installations.
Answer: The consultation includes an assessment of your electrical issue, expert advice, and recommendations for the best solution.
Answer: No. The consultation is for assessment and guidance only. Any repair or installation work is charged separately.
Your cart is empty
Add services to get startedSimple steps to get your service done
Browse and select the service you need.
Review details and book your service.
Enter address and confirm your request
Verified professionals complete the job hassle-free.
Top-rated experts. Background-checked for your safety
Clear and upfront pricing. No hidden charges
We value your time. Punctual service is our promise
High standards at every step for lasting results.